Project Title |
Features / Purpose |
Schedule |
Laboratory renovation project to suit 3+3+4/5 new education system |
To renovate some 30 special labs and some 10 multi-purpose labs on campus to suit new teaching needs of the 3+3+4/5 new education system. |
Expected to be completed in Aug 2012. |
Improvement Works at Lecture Theatre 1 at C-LP-11 |
To improve the existing acoustic, lighting performances and interior decoration for hosting concert, multi-media, teaching and learning functions. |
Expected to be completed in mid 2012. |
Learning Commons Project in Block C |
To extend the learning commons area on LP/F and P/F of Block C for learning and interaction by student and staff. |
Completion by end of 2011. |
Improvement Works at the Gymnasium of H Y Cheung Sports Hall at Block E |
To construct a new means of escape and improve the interior of main gymnasium for holding multi-purpose functions and congregation with maximum 1250 persons capacity. |
Completion by end of 2011. |
Construction of a Permanent Canopy at the Central Plaza |
To construct a permanent canopy to replace the temporary tensile cover, using the advanced Cube, Ethylene Tetra-Fluoro-Ethylene (ETFE) cushion system for its roof materials, so as to enhance the use of the Central Plaza for institute/student events all year around. |
Completion in July 2011. |
Replacement of Air-cooled Chillers by Water-cooled Chillers |
To replace the existing air conditioning plant by a water-cooled system to improve plant efficiency by 25-40%, and to achieve an estimated annual energy saving of 1,200MWh and a corresponding annual reduction in CO2 emission from electricity generation of around 1,200,000Kg, upon completion of first phase. |
Completion in June 2011. |
Classroom conversion for the "3+3+4" new education system |
To modify and refurbish the existing 57 classrooms to suit the new teaching needs in anticipation of “3+3+5” curriculum. |
The first and second phases were completed in Dec 2010 and May 2011 respectively. |
Institute’s Reception |
To create a proper reception area for the Institute’s overseas delegation visits, press conferences, worldwide events and to fully utilize the prime location at Block A – G/F of the Information Centre, the said area shall be fitted out as a delegation reception cum multi-purpose area. The Information Centre shall be relocated to another room also on G/F. |
Completion in August 2010. |
Provision of access platform in the service voids of the hostels |
To construct the access platform in each services voids of the student hostel A, B & C to provide the accessible area for inspection and maintenance works in the services voids. |
Completion in August 2010. |
Conversion of G/F of Block E into a Conference Centre |
To convert the area on G/F of Block E into a permanent multi-functional venue for Institutional activities, for which basic decoration of walls, ceiling and floor, construction of some functional rooms and installation of audio-visual equipment were done. |
Completion in August 2010. |
Safety Provision for Lifts in Tai Po Campus |
To install the Rope Gripper so as to improve the lift safety and prevent it from unexpected upward movement. |
Completion in December 2009. |
Installation of Sensor-operated Water Taps for toilets in Tai Po Campus and Pak Shek Kok Sports Centre and Student Hostels |
To replace the existing hand-operated water taps in toilets with sensor-operated ones to reduce the risk of bacteria contamination through the hand wheels of water taps. |
Completion in December 2009. |
Learning Commons (Phase I) |
To convert original ITS offices and laboratories into area for learning commons providing spaces for students to learn, interact and discuss with convenient access to the Library and IT help desk. |
Completion in November 2009. |
Renovation of Student Canteen at Block C |
To refurbish of student canteen for both seating and kitchen area with a cafe area to offer more food/catering choices. |
Completion in September 2009. |
Conversion of Computer Room of Town Centre Room 237 to Creative Media Lab |
To upgrade the PC computers at room 237 of Town Centre to a Creative Media Lab so as to enhance teaching effectiveness through the provision of Mac-based computers. |
Completion in September 2009. |
Conversion of 300P Lecture Theatre into a Multi-functional Venue |
To change a regular 300p lecture theatre to a venue to cater for more diverse ceremonies and events with a stage built with basic provisions. |
Completion in 2009. |
Integration of the Library’s “Bibliographic Instruction” Room into the Mong Man Wai Library |
To improve the information literacy programs and to optimize the use of facilities via integration of existing Bibliographic Instruction room at D1-P/F-01 into the 1/F of Mong Man Wai Library. |
Completion in June 2009. |
Formation of the Hong Kong Museum of Education at D1-P-01 |
To install a 24-hour humidity controlled room and delicate showcases for display of historical items. |
Completion in May 2009. |
Thermal Storage System for Chilled Water System |
To increase the cooling capacity of the central air conditioning system without increasing the plant size and shift the load to non-peak hours, and reduce the energy consumption by operating the chillers in a more efficient condition. |
Completion in March 2009. |
Formation of the Children Literature Special Collection in the Library |
To establish a Children’s Literature Resources Centre on 3/F of Mong Man Wai Library for advancement of children literature education. |
Completion in February 2009. |
Pilot Scheme for Teaching Venue Re-modeling at Room D3-LP-02 |
To convert two computer classrooms to a modern one which will be equipped with new comprehensive AV and teaching equipment and provided with movable furniture to allow flexible teaching needs. A pilot scheme to create prototypical classroom to suit the 3-3-5 pedagogical change. |
Completion in February 2009. |